Reelsautomatik ·
Fit a short storyboard to a defined running time
Time sections help with planning but do not replace reviewing the actual edit.

Use duration as a boundary
Choose an intended total length and one central message. Identify which information must remain and which details can be omitted. A shorter time limit does not automatically make more text understandable. If the draft contains too many ideas, reduce the scope instead of simply planning to deliver every sentence more quickly.
Give sections distinct jobs
Divide the sequence into an opening, main section and ending. Assign one purpose to each. The opening identifies the subject, the main section shows or explains the message, and the ending leads to a suitable next thought or action. This is a working structure: it must fit the available material without changing the meaning of what was actually recorded.
Record image and text together
For each section, describe the intended picture, spoken statement and possible on-screen text. This makes contradictions visible early. If a scene shows something different from what the text claims, revise the brief. Also identify material that still needs filming. A fully populated storyboard is not evidence that every planned shot already exists.
Read the sequence aloud
Read the planned statements at a normal pace and check that pauses and transitions have room. A mathematically neat allocation can still feel rushed when spoken. Remove unnecessary repetition or simplify the thought. Later, inspect the real edit to see whether captions, picture changes and sound remain understandable together. Timestamps alone cannot establish that result.
Hand it over as a draft
Record the total length, unresolved material questions and the person responsible for approval. The local workbench allocates time sections from your inputs; it does not produce a finished film or assess footage. A clear draft supports preparation, while the final effect can only be judged in the actual video. Include a separate viewing step before approval rather than treating the calculated timeline as a completed production.